This week we updated the Labarchives and continued to research about different project approaches. We plan to meet up this weekend to update the teammates with individual progress and potentially adjust the design specs
The team is currently doing research on different methods in detecting potential components that are present in the leakage and on how to incorporate the methods in a drainage system design.
We also met with Dr. Klaesner to discuss about LabArchives.
The focus for this week was the team’s webpage. In addition, the team met to discuss the returned preliminary report and went through the comments from the instructor and the teaching assistants. We worked on fixing the problems in the preliminary report, especially on the section of existing solutions and the design parameters.